Since 2009, Adrem Invest has been providing installation, verification, replacement, maintenance and administration services for metering equipment in the Oltenia Energy Distribution (DEO) network, in one of the largest projects of this type managed by the company.
The activity covers the entire operational cycle of the measurement infrastructure, from field interventions and meter installation to the verification of technical parameters, equipment configuration and management of operations associated with measurement points.
Throughout the collaboration, Adrem Invest has installed and managed over 2.2 million classic meters, contributing to the operation of the metering infrastructure for over 2.7 million consumption points in the DEO distribution area.
Since 2020, the activity has also expanded to smart metering. To date, Adrem Invest’s teams have installed over 489,000 smart meters, with activities that include the installation, configuration, testing and commissioning of equipment.
The project involves the management of a high volume of operations carried out in the field, in an extensive infrastructure, and the constant coordination of the teams involved in the installation, replacement, verification and maintenance of the measuring equipment.
Through the experience gained and the scale of the operations managed, Adrem Invest contributes both to the operation of the existing metering infrastructure and to the gradual transition to smart metering systems.
489.705
Smart meters installed
+2.2K
Classic (nonsmart) meters installed and managed
18 years
Collaboration
+2.7K
metering points managed in metering infrastructure